city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Global Technology Outage
/
City of Boston services may be impacted by a global technology service outage. We encourage residents to call ahead before attempting to access services at municipal buildings. We will provide additional updates as they become available.
Last updated:

Boston Landmarks Commission

The commission will hold its next monthly public hearing on Tuesday, December 12, 2023, at 6 p.m.

Please note: This hearing will be held virtually and not in person. To participate, please go to our Zoom meeting link or call 929-436-2866 and enter meeting ID 972 7606 8692 . You can also email comments through email at blc@boston.gov

Public testimony begins at

Discussion Topics

  1. DESIGN REVIEW HEARING - CANCELED - No Design Review Items

     

     

  2. BUSINESS MEETING AT 6PM

    ADMINISTRATIVE REVIEW/APPROVAL

    In order to expedite the review process, the commission has delegated the approval of certain work items, such as those involving ordinary maintenance and repair, restoration or replacement, or which otherwise have a minimal impact on a building’s appearance, to commission staff pending ratification at its monthly public hearing. Having been identified as meeting these eligibility criteria and all applicable guidelines, the following applications will be approved at this hearing:

    24.0490 BLC - 19 ASHLAND STREET, Boston, MA 02125

    New addition to pending landmark building as per BLC design review from advisory hearing last year. BLC gave a letter of support for the project for their ZBA application, which was approved. 

    24.0529 BLC - 206 WASHINGTON STREET , Boston, MA 02108

    Application includes reinstallation of the original gilded eagle at the east chimney top of the Old State House.

    23.0266 BLC- 10 MELVILLE AVE, Boston, MA 02124

    Emergency application includes replacement of all of the windows in the main house with 1/1 lite configuration all-wood double hung windows. 

    24.0490 BLC - 137 BEACON STREET, Boston, MA 02116

    Replacing wood lath and horsehair plaster, where missing, or damaged strictly utilizing    traditional materials: sawn lath and lime putty-and-sand animal haired plaster; Reattaching all loose plaster where possible aiming at saving as much of the original as possible; Repairing cracks and holes on all walls and ceilings, as necessary, utilizing traditional lime  putty-and-sand plaster; & Scrape, sand and prepare all plaster surfaces for paint application Prime and paint all walls and ceilings.

    Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Following the hearing, you will be issued a Determination Sheet to present at the Inspectional Services Department (1010 Massachusetts Avenue) as proof of project approval when applying for permits. ISD personnel will send an electronic copy of your building-permit application to the commission staff for review. (To avoid potential confusion, the text of your building-permit application should be consistent with the project description given below.) Commission staff will accordingly authorize the execution of the work, attaching any applicable provisos, reflecting the relevant guidelines and precedents. 

    PLEASE NOTE THAT FOLLOWING ISSUANCE OF THE DETERMINATION SHEET NO FURTHER CORRESPONDENCE WILL BE ISSUED for the applications listed below. The electronic building-permit application as annotated by commission staff will constitute your Certificate of Appropriateness; this will be valid for two years from the date of the hearing. The applicant is required to notify the commission of any project changes; failure to do so may affect the status of the approval.  If you have any questions not addressed by the above information, please contact staff at 617.635.1935 or BLC@boston.gov. Thank you.

  3. STUDY REPORTS AND DESIGNATIONS

    #225.16 BLUE CROSS BLUE SHIELD BUILDING, 133 FEDERAL STREET, BOSTON, 02110

    The draft study report for the Blue Cross/Blue Shield building was posted and distributed on  November 20, 2023.

    -Commissioner Comments/Questions

    -Public Comment and Feedback

      Link to Study Report

     

    #132.00 RICHARDSON BLOCK, BOSTON, MA 

    The draft study report for the Richardson Block was posted and distributed on November 3, 2023 and public feedback closed on December 1, 2023. 

    -Vote to accept the amended study report

    -Vote to designate the Boston Landmark

       Link to Study Report

     

  4. HEARING MINUTES

    Review and ratification of Public Hearing Minutes from 11/28/23.

  5. STAFF UPDATES

    01/09/2024 - NEXT BLC HEARING 

    Business Hearing at 6pm

     

  6. ADJOURNMENT

    Vote to adjorn