city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Last updated:

South End Landmark District Commission

The South End Landmark District Commission will hold a public hearing on Monday, May 11, at 5 p.m.

This hearing will be held virtually and not in person. You can participate in this hearing by going to our Zoom meeting link, or calling 929-205-6099 and entering meeting ID 832 2751 2223 #. You can also submit written comments or questions to SouthEndLDC@boston.gov or via Twitter @bostonlandmarks.

The public can offer testimony.

Discussion Topics

  1. Design Review

    APP # 20.938 SE          31 Worcester Street. Proposed Work: At the garden level, modify entryway under the stoop, remove an iron gate, and install a door

    APP # 20.884 SE           81 Warren Avenue. Proposed Work: Construct a roof deck with hatch access

    APP # 20.905 SE          36 Greenwich Park. Proposed Work: At the rear façade mansard level, install sliding glass doors and install a deck

    APP # 20.915 SE          227 West Canton Street. Proposed Work: Construct a roof deck

    APP # 20.922 SE          18 Dartmouth Street. Proposed Work: Construct a roof deck with hatch access  Withdrawn by applicant

    APP # 20.859 SE          190 West Brookline Street. Proposed Work: Construct a roof deck and head house Withdrawn by staff

    APP # 20.947 SE          160 West Canton Street. Proposed Work: At the roof, construct a deck with hatch access; at the entry, modify double leaf entry doors and install glazing

  2. Administrative Review/ Approval

    APP # 20.901 SE          505 Massachusetts Avenue: At the Massachusetts Avenue and Tremont Street facades repoint brick joints with new mortar to match historic mortar in terms of color, texture, joint width, profile, and tooling; restore precast lintels and sills to match original profiles; repaint first floor façade to match existing

  3. Staff Updates
  4. Projected Adjournment: 7:00 PM
Back to top