city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Social Media Survey
/
We want to better understand where folks in the City of Boston are finding news and information through social media. To help with this effort, please take our quick survey today:
Last updated:

Fenway, Longwood, Kenmore Design Projects

We're enhancing public spaces and improving safety and access for people biking and walking in key areas of Fenway, Longwood, and Kenmore.

The following projects were identified in the 2009 Fenway-Longwood-Kenmore Transportation and Pedestrian Action Plan:

  • HAVE QUESTIONS? CONTACT US!
  • 617-636-4680
  • 1 CITY HALL SQUARE

    ROOM 721

    BOSTON, MA 02201-2026

Audubon Circle Reconstruction

Audubon Circle 2018 work

Public Works reconstructed Audubon Circle in 2018. The project included:

  • sidewalk improvements
  • separated bike lanes
  • curb extensions
  • narrower travel lanes, and
  • street trees and other landscape improvements along Beacon Street.
SUMMER 2020 WORK

During summer 2020, the Transportation Department will extend the separated bike lanes from Miner Street to Kenmore Square. This will complete a high-comfort bike route between Kenmore Square and the Brookline town line.

September 2011 ACNA Meeting

A meeting was held on September 20, 2011, with the Board of the Audubon Circle Neighborhood Association. We addressed concerns about the loss of the median and the safety of pedestrian crossings. A six-foot wide pedestrian refuge island (similar to what exists today) has been added to the design at Miner Street. The refuge island, in combination with the addition of bike lanes, narrower travel lanes, new street trees, and new curb extensions, is intended to slow traffic and improve the comfort and safety of this pedestrian crossing. 

The meeting also included a brief presentation by Boston Water and Sewer Commission on work they will be doing in 2012 to upgrade the water, sewer, and drainage systems in advance of the street reconstruction project:

Meeting Presentation (September 2011)

Transportation and Pedestrian Safety Action Plan

  • HAVE QUESTIONS? CONTACT US!
  • 617-636-4680
  • 1 CITY HALL SQUARE

    ROOM 721

    BOSTON, MA 02201-2026
Back to top