< Go to Building Housing Homepage
Project Name

Brian J. Honan Apartments Deep Energy Retrofit

Project Parcels

2201764010

33 EVERETT ST
Owner:
Other
71,600sqft

No photos uploaded (yet!)

Neighborhood
Allston/Brighton
Councilor
Breadon
Units Total
50
Income-Restricted Units
50
Property Size
71,600 sq/ft

Developer

Allston Brighton Community Development Corporation

Project Goals

Brian J Honan Apartments is a preservation proposal from Allston Brighton CDC that will combine badly-needed physical repairs with deep energy retrofit measures to significantly reduce the energy consumption and carbon emissions footprint of the property. There are nine townhouse-style buildings at the property, in varying sizes and with 50 total units spanning one to three bedrooms
each. The building exteriors have a distinctive style that the development team is working to preserve where possible. When the buildings were constructed in 2005, two factors combined such that there has been significant physical deterioration: quality lumber was not available in the wake of Hurricane Katrina, and Hardie Plank siding was used when the product was still in its earliest form. As a result of these envelope failures, the property is experiencing water infiltration and rotting of sheathing and
framing, requiring very costly annual repairs.

Timeline

Funding awarded

Mayor’s Office of Housing approved funding for this project.

City Planning

This project is going through a zoning review with the Boston Planning and Development Agency (BPDA). Then we’ll work with the Developer on funding, design, and compliance.

Under Construction

Predicted Date: To Be Determined

Project Complete

Predicted Date: To Be Determined
    Back to top