city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Social Media Survey
/
We want to better understand where folks in the City of Boston are finding news and information through social media. To help with this effort, please take our quick survey today:
Last updated:

Beacon Hill Architectural District

The Beacon Hill Architectural Commission will hold its monthly public hearing on Thursday, February 16, 2023, at 5 p.m.

ATTENTION: This hearing will only be held virtually and NOT in person. You can participate in this hearing by going to our online meeting or calling 1-929-205-6099 and entering meeting id # 973 8413 0172. You can also submit written comments or questions to BeaconHillAC@boston.gov.

The public can offer testimony.

Discussion Topics

  1. DESIGN REVIEW

    APP # 23.0498 BH 15 REVERE STREET

    Proposed Work: Replace existing store glass with thermo-pane glass with a spacer bar covering the gaskets. All trim remains the same.

    APP # 23.0565 BH 60 MOUNT VERNON STREET

    Proposed Work: Add single granite step to existing granite sill.

    APP # 23.0563 BH 60 MOUNT VERNON STREET

    Proposed Work: Install new shutters.

    APP # 23.0585 BH 19 REVERE STREET

    Proposed Work: Install new intercom.

    APP # 23.0586 BH 1 CHESTNUT STREET (Withdrawn By Applicant)

    Proposed Work: Install two new commemorative plaques identifying the home as where both Corretta Scott King and Henry Kissinger resided during their time in Boston.

  2. ADMINISTRATIVE REVIEW/APPROVAL

    APP # 23.0578 BH 50 BEACON STREET: At penthouse level, replace 17

    non-historic windows, keeping the existing wood jambs, sills & brick moldings.

    Spruce Street elevation: eight total, 1 over 1, arched top windows, Spruce Street

    elevation has six total 6 over 6 and one total 4 over 4. Branch Street has two total 6

    over 6. Replacements will replicate existing window grid patterns, true divided

    lights, wood and double hung.

    APP #23.0544 BH 37 CHESTNUT STREET: Repoint brick facade in kind,

    remove and restore existing shutters.

    APP # 23.0462 BH 38 LIME STREET: Replicate and replace all existing

    shutters, color and finish to match existing.

    APP # 23.0564 BH 60 MOUNT VERNON STREET: Install storm windows

    APP #23.0535 BH 48-52 PHILLIPS STREET: Repoint brick facade in kind.

    APP #23.0534 BH 19 SOUTH RUSSELL STREET: Repoint brick facade in

    kind.

  3. RATIFICATION OF 1/19/2023 PUBLIC HEARING MINUTES & 12/12/2023 PUBLIC SUBCOMMITTEE MINUTES
  4. STAFF UPDATES
Back to top