Renew Boston Trust Phase II

Renew Boston Trust is a self-financing model to make City buildings more energy efficient and cost effective

About

In Phase 2, Energy Conservation Measures (ECMs) were installed in 31 buildings chosen in the project scope:

  • six libraries
  • 10 fire stations
  • seven police facilities
  • three parks facilities
  • one property management facility, and
  • four community centers.

Phase 2, like Phase 1, included:

  • installing newer high efficiency equipment
  • upgrading existing equipment, and
  • retro-commissioning.

Utilities at these 31 facilities cost $3,244,918 per year. Phase 2 upgrades will result in $415,405 in guaranteed savings for the first full year after construction is complete. Annual dollar savings pay for the cost of installation and implementation of the ECMs.

Interactive Map

Check out RBT's project locations and energy-saving measures:

Launch map

Dollar Savings

Dollar Savings Phase 2 Edit 2
This is a chart showing the guaranteed savings per department. The 6 departments and the 31 facilities in Phase 2 achieved $415,405 in total guaranteed savings per year. To view an accessible version of this chart, please click here.

Energy Savings

Energy Savings Phase 2 Edit 3

 This chart shows the energy savings in MMBtu per year achieved by each department in Phase 2. One MMBTu is equivalent to a million British thermal units. One British thermal unit is the standard unit of energy necessary to increase the temperature of one pound of water one degree Fahrenheit at standard atmospheric pressure. The total guaranteed energy savings for Phase 2 projects is 10,763 MMBtu per year. The Boston Fire Department, Boston Public Library, and the Boston Police Department achieve the highest energy savings among Phase 2 projects. To view an accessible version of this chart, please click here

Emissions Savings

Emissions Savings Phase 3

 Phase 2 projects save 996 MTCO2e/yr. MTCO2e/yr signifies metric tons of carbon dioxide equivalent released per year. This is a unit that represents the global warming potential of all greenhouse gasses emitted by combustion in buildings. The unit is standardized to CO2: the most common greenhouse gas. The greatest greenhouse gas emissions savings in Phase 2 were achieved by the Boston Fire Department, the Property Management Department, and the Boston Public Library. To view an accessible version of this chart, please click here

BCYF-Emissions-Phase 2_Update

BFD Emissions Savings Phase 2

PARKS Emissions Phase 2

BPD Emissions Savings Phase 2

 

BPL PMD Emissions Savings Phase 2
These charts show the greenhouse gas emissions for facilities prior-to and after RBT Phase 2 upgrades. MTCO2e/yr signifies metric tons of carbon dioxide equivalent released per year and is a unit that represents the global warming potential of all greenhouse gasses emitted by combustion in buildings. The unit is standardized to CO2: the most common greenhouse gas. To view an accessible version of these charts, please click here.

Phase II Timeline

RBT phase 1 timeline

Timeline details

  • The Optimized IGA report further developed the cost and savings associated with the ECMs identified in the DTEAR.

Final IGA included:

  • guaranteed energy savings, and
  • guaranteed maximum pricing associated with the ECMs to be installed.

Building-Level Upgrades

Building Upgrades

ECM 2.2

Cooling Tower Replacement

ECM 3.1

Building Management System Upgrades

ECM 6.1

Building Envelope Improvements

ECM 19.2

Plug Load Power Management 

ECM 1.1

Boiler Replacements

ECM 2.1

Chiller Replacement

ECM 3.1

Building Management System Upgrades

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 8.1

Install High Efficiency Motors & VFDs

ECM 13.1

Water Conservation Upgrades

ECM 19.2

Plug Load Power Management 

ECM 3.1

Building Management System Upgrades

ECM 4.6

De-Stratification Fans

ECM 6.1

Building Envelope Improvements

ECM 8.1

Install High Efficiency Motors & VFDs

ECM 19.2

Plug Load Power Management 

ECM 3.1

Building Management System Upgrades

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 8.1

Install High Efficiency Motors & VFDs

ECM 13.1

Water Conservation Upgrades

ECM 19.2

Plug Load Power Management 

ECM 3.1

Building Management System Upgrades

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 19.2

Plug Load Power Management 

ECM 1.1

Boiler Replacements

ECM 1.3

Domestic Hot Water System Upgrades

ECM 3.1

Building Management System Upgrades

ECM 4.1

AHU/RTU/Unit Ventilator/Fans Replacement

ECM 6.1

Building Envelope Improvements

ECM 19.2

Plug Load Power Management 

ECM 1.1

Boiler Replacements

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 6.7

Cap Abandoned Exhaust Openings & Ventilation Shafts

ECM 13.1

Water Conservation Upgrades

ECM 19.1

Computer Power Management

ECM 19.2

Plug Load Power Management 

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 6.7

Cap Abandoned Exhaust Openings & Ventilation Shafts

ECM 7.1

Install Pipe Insulation

ECM 7.2

Steam Trap Retrofits

ECM 13.1

Water Conservation Upgrades

ECM 19.1

Computer Power Management

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 7.1

Install Pipe Insulation

ECM 7.2

Steam Trap Retrofits

ECM 13.1

Water Conservation Upgrades

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 3.1

Building Management System Upgrades

ECM 6.1

Building Envelope Improvements

ECM 1.1

Boiler Replacements

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 3.1

Building Management System Upgrades

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 3.1

Building Management System Upgrades

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 3.1

Building Management System Upgrades

ECM 4.9

Variable-Refrigerant-Flow (VRF) Systems

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 1.3

Domestic Hot Water System Upgrades

ECM 3.1

Building Management System Upgrades

ECM 4.1

AHU/RTU/Unit Ventilator/Fans Replacement

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 2.1

Chiller Replacement

ECM 3.1

Building Management System Upgrades

ECM 4.1

AHU/RTU/Unit Ventilator/Fans Replacement

ECM 6.1

Building Envelope Improvements

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 1.3

Domestic Hot Water System Upgrades

ECM 2.1

Chiller Replacement

ECM 6.1

Building Envelope Improvements

ECM 8.1

Install High Efficiency Motors & VFDs

ECM 13.1

Water Conservation Upgrades

ECM 3.1

Building Management System Upgrades

ECM 4.6

De-Stratification Fans

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 19.2

Plug Load Power Management 

ECM 6.1

Building Envelope Improvements

ECM 17.1

Retro-Commissioning 

ECM 4.6

De-Stratification Fans

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 17.1

Retro-Commissioning 

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 13.1

Water Conservation Upgrades

ECM 4.1

AHU/RTU/Unit Ventilator/Fans Replacement

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 6.3

Window Replacement

ECM 7.1

Install Pipe Insulation

ECM 13.1

Water Conservation Upgrades

ECM 1.1

Boiler Replacements

ECM 5.1

Lighting & Lighting Controls Upgrades (Interior & Exterior)

ECM 6.1

Building Envelope Improvements

ECM 6.3

Window Replacement

ECM 13.1

Water Conservation Upgrades

Glossary

Reference the Glossary page for detailed descriptions of the building upgrades:

Glossary of ECMs