South End Landmark District Commission

The South End Landmark District Commission will hold its monthly public hearing on Tuesday, May 5, 2020, at 5:30 p.m.

This hearing will be held virtually and NOT in person. You can participate in this hearing by going to our Zoom meeting link, or calling 929-205-6099 and entering meeting ID 923 3774 0653 #. You can also submit written comments or questions to SouthEndLDC@boston.gov or via Twitter @bostonlandmarks.

The public can offer testimony.

Discussion Topics

  1. Design Review Hearing

    APP # 20.973 SE          Tremont Street (between Massachusetts Avenue & Arlington Street). Proposed Work: Modify Tremont Street layout and intersections; construct raised crossings, built islands, and raised bus stop platforms; and relocate select utilities

    APP # 20.972 SE          685 Tremont Street. Proposed Work: Install fencing at Library ParkSee additional items under Administrative Review

    APP # 20.908 SE          293 Northampton Street. Proposed Work: Install a fence, granite curb, planting bed, and landscaping

    APP # 20.737 SE          437 Shawmut Avenue. Continued from 2/04/2020 SELDC Public Hearing. Proposed Work: Construct a rear shed dormer at the roof                         

    APP # 20.940 SE          9 Cazenove Street. Proposed Work: Construct a roof deck

     APP # 20.944 SE          5 Rutland Square. Proposed Work: Construct a roof deck with sliding skylight system

    APP # 20.909 SE          11 Bradford Street. Proposed Work: Proposed Work: At the roof level, demolish penthouse/solarium and construct stair head house and roof deck; at the front façade third level modify shed dormer openings, install three new windows, and install cladding; at the front façade basement through second levels install fire bell and water connection; replace entry door and infill with new doors and transom; replace vents; and paint concrete base and trim

    APP # 20.827 SE          566 Columbus Avenue. Proposed Work: Construct a new building

  2. Administrative Review/ Approval

    APP # 18.1132 SE          30 East Concord Street: Replace the following items in kind: wood panel cladding on penthouse; wood edge of roof; individual damaged slate shingles on mansard roof. Rebuild existing masonry chimney in kind, paint metal at tops of dormers to match existing. Extension of Certificate of Design Approval to expire on 5/01/2020.

    APP # 20.972 SE          685 Tremont Street: Repair and refurbish existing exterior fence at Library Park. See additional items under Design Review.

    APP # 20.970 SE          84 West Concord Street: At the front façade street level, replace seven one-over-one aluminum windows with one-over-one, aluminum-clad windows.

  3. Ratification of 3/03/2020 Public Hearing Minutes
  4. Staff Updates
  5. Projected Adjournment: 9:00 PM