city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Social Media Survey
/
We want to better understand where folks in the City of Boston are finding news and information through social media. To help with this effort, please take our quick survey today:
Last updated:

South Huntington Avenue Better Bike Lane

We built parking-protected bike lanes on South Huntington Avenue from Centre Street to Heath Street. And, we're working with you to plan changes north of Heath Street.

Learn about recent changes between Centre Street and Heath Street.

Review recent changes

A photo realistic rendering of South Huntington Ave showing proposed parking protected bike lanes.
South Huntington Avenue between Centre Street and Heath Street.
  • Still have questions? Contact:
    Transportation
  • Stay Connected

    Sign up to receive email updates about this project.

Upcoming Events

Events

Why South Huntington

South Huntington Avenue connects Jamaica Plain and Mission Hill to the Longwood Medical Area, one of the region’s major employment centers. But, the street is the top 3% high-crash corridors for people biking citywide. And, many of the curb ramps are inaccessible.

Everyone in Boston deserves safe streets
A group of six youth are riding bikes on a path by their school.

This project is part of a bold plan for transforming Boston's streets to better serve people walking, rolling, and riding bikes. Over the next three years, we will expand our bike network so that 50% of residents will be a 3-minute walk from a safe and connected bike route.

Read more about our plan

The project area includes South Huntington Avenue between Huntington Avenue and Centre Street. It spans Mission Hill and Jamaica Plain. We finished work on the section between Centre Street and Heath Street in the first half of 2023.

For the section between Heath Street to Huntington Avenue, we are working with residents to design near-term safety improvements.

Map showing location and extent of South Huntington Ave better bike lane in Jamaica Plain and Mission Hill. One callout reads: Centre St to Heath St: finish work by spring 2023. Another callout reads:  Heath St to Huntington Ave: work with residents to design near-term safety improvements. Aim to make changes by the end of 2023.

Heath Street to Huntington Avenue

We will work with you to design near-term safety improvements for people walking and biking on South Huntington Avenue, between Heath Street and Huntington Avenue. We will make those changes in 2023 or 2024. As part of this work, we plan to:

  • repave sections of the street that were not repaved with Green Line work in recent years
  • rebuild curb ramps along the street to improve accessibility

Our near-term work on South Huntington Avenue will not preclude any future bigger thinking about improved transit connections and accessibility on the Green Line E Branch.

Centre Street to Heath Street

Planned cross section for South Huntington Ave. It includes parking protected bike lanes.

We installed protected bike lanes on South Huntington Avenue between Centre Street and Heath Street. 

Changes to South Huntington Avenue include:

We are also looking at the traffic signals at Centre Street, Perkins Street, and Bynner Street. We may make changes to how these signals operate to increase safety and efficiency for all users.

Talk with us

We need you to get it right! Here are some ways you get talk with us about South Huntington Avenue.

Meet with us during Office Hours

You can talk with a member of the project team one-on-one. We will be available between 3 and 7 p.m. every other Wednesday. Sign up for a 15-minute phone call or virtual meeting.

Make an appointment

Send us an email

Write your comments to us via email at better-bike-lanes@boston.gov.

Project Updates

Updates

CONSTRUCTION STARTING SOON!

April 14, 2023 UPDATE

Planned cross section for South Huntington Ave. It includes parking protected bike lanes.

We're installing protected bike lanes on South Huntington Avenue between Centre Street and Heath Street. 

Please observe all posted signs about temporary parking restrictions and construction detours. Schedules may change. Our work is dependent on the weather.

Changes to South Huntington Avenue will include:

We are also looking at the traffic signals at Centre Street, Perkins Street, and Bynner Street. We may make changes to how these signals operate to increase safety and efficiency for all users.

What to expect:

View the design plans (PDF 7.5 MB)

changes to on-street parking (PDF 228 KB)

Talking with you:

We sent an update to our project email list on April 14, 2023.  You can get updates by joining the email list by scrolling up to the "Stay Connected" section.

View the email

In October 2022, we mailed 6,436 postcards to addresses in Jamaica Plain and Mission Hill.

View the postcard (PDF 2.5 MB)

We distributed flyers to residential buildings along South Huntington Avenue between Centre Street and Heath Street in mid-November 2022.

View the flyer (PDF 1.4 MB)

Update: December 16, 2022

We have completed the following work on South Huntington between Centre Street and Heath Street:

  • Rebuilt inaccessible curb ramps and replaced crosswalks
  • Installed the double yellow-centerline and stop bars at intersections

Due to the onset of cold weather, we will not be able to complete work on the parking-protected bike lane this season. We look forward to finishing the work when weather allows in spring 2023. These changes will include:

  • Parking-protected bike lanes
  • Shorter and more visible pedestrian crossings
  • Minor loss of parking to increase visibility at some driveways and intersections

We are also looking at the traffic signals at Centre Street, Perkins Street, and Bynner Street. We may make changes to how these signals operate to increase safety and efficiency for all users.

What to expect:

View the design plans (PDF 7.5 MB)

changes to on-street parking (PDF 228 KB)

Talking with you:

We mailed 6,436 postcards to addresses in Jamaica Plain and Mission Hill. The postcards began arriving in late October 2022.

View the postcard (PDF 2.5 MB)

We distributed flyers to residential buildings along South Huntington Avenue between Centre Street and Heath Street in mid-November 2022.

View the flyer (PDF 1.4 MB)

We sent an email update to the project email list. You can get updates by joining the email list by scrolling up to the "Stay Connected" section.

View the email

We have the opportunity to improve safety now on South Huntington Avenue between Centre Street and Heath Street. This work is possible now following the completion of a scheduled repaving. These changes will make it safer and easier for you to walk and bike on South Huntington.

If weather allows, we may be able to install the changes in the coming weeks. If not, we will start work next spring. These changes will include:

  • Parking-protected bike lanes
  • Shorter and more visible pedestrian crossings
  • Upgrade inaccessible curb ramps (already complete)
  • Minor loss of parking to increase visibility at some driveways and intersections

We are also looking at the traffic signals at Centre Street, Perkins Street, and Bynner Street. We may make changes to how these signals operate to increase safety and efficiency for all users.

What to expect:

View the design plans (PDF 7.5 MB)

changes to on-street parking (PDF 228 KB)

Talking with you:

We mailed 6,436 postcards to addresses in Jamaica Plain and Mission Hill. The postcards began arriving in late October 2022.

View the postcard (PDF 2.5 MB)

We are distributing flyers to residences along South Huntington Avenue between Centre Street and Heath Street.

View the flyer (PDF 1.4 MB)

  • Still have questions? Contact:
    Transportation
  • Stay Connected

    Sign up to receive email updates about this project.

Back to top