South End Landmark District

The South End Landmark District was designated in 1983.

The South End Landmark  District Commission (SELDC) meets on the first Tuesday of each month to review proposals. Interested in becoming a commissioner? Please see details about nomination in the district's Study Report and check the commission information section at the bottom of this page. If you see an "apply online" button, we have an opening on the commission and you're able to apply for it.

DESIGN REVIEW PROCESS

PLEASE NOTE: Applications are accepted on a rolling basis. Staff must determine that your application is complete fifteen (15) business days prior to a public hearing date to be added to the agenda. Incomplete applications cannot be added to an agenda. 

APPLY FOR DESIGN REVIEW ONLINE

Work subject to the review of the SELDC includes:

  • all proposed exterior work at front facades
  • all exterior work at rooftops (when visible from a public way), and
  • all exterior work at side and rear elevations (when side and rear elevations directly face a public way).

You must submit a Design Approval Application to the Commission. It must be approved by the Commission before beginning any exterior work subject to Commission review. In the South End Landmark District Protection Area, only certain items of work are subject to review. Please see our map.

  • To save time and costs, please contact staff early in the planning process to determine project compliance with the standards and criteria.
  • Review all instructions and documentation requirements before submitting your application to ensure it is complete. Only complete applications will be added to a public hearing agenda.
  • Submit your application well in advance of the fifteen business day deadline in case it is marked incomplete and additional or revised information is needed.
  • Staff is not available to review applications for completeness immediately upon submittal.
  • Do not begin any work, or buy materials, until after you receive confirmation that your project has been approved.
HISTORY

Originally marshland bisected by a narrow strip of land called The Neck (now Washington Street), the South End consists of historic residential blocks, parks, and main thoroughfares with commercial, industrial, and institutional buildings. After the marsh was filled, development began in 1850 by real estate speculators building fashionable, single-family rowhouses. Restrictions on building size and materials meant residential structures in long uniform rows, resulting in remarkable visual unity throughout the area. After the Financial Panic of 1873, the most wealthy Bostonians moved to the brand new Back Bay. By the turn of the century, lodging houses geared towards the working class were almost the only residential structures built. For further historical background, please see the South End Landmark District Study Report.

Resources

Resources
1. CHECK TO SEE IF YOU'RE IN THE DISTRICT:
2. FIND OUT WHAT WORK IS ALLOWED:
3. WHEN CAN MY APPLICATION GET ON THE AGENDA?
4. APPLY FOR WORK
5. RECEIVE DECISION LETTER
  • Once your application has been ruled on by the commission, your decision letter will be emailed to you.
  • If approved, use the decision letter to obtain your building permit with the building department. Be sure to display your approval placard on site, visible to the public, for the duration of the project.
SELDC 2022 recordings

Commission Info

  • Department:
  • Authority:
    State
  • Term:
    3 years
  • Stipend:
    No
  • Total Seats:
    7

Current members

Member Appointed Expires Status
John Amodeo 3/27/2024 1/20/2027 Active
John Freeman 3/27/2024 1/20/2027 Active
Christopher DeBord 3/27/2024 1/20/2027 Active
Felicia Jacques 3/27/2024 1/20/2027 Active
Catherine Hunt 3/27/2024 1/20/2027 Active
Kevin Ready 8/28/2024 Active