city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Last updated:

Deployables Day

A citywide training exercise on temporary flood protection.

September 27, 2024
2024-09-27T10:00:00 - 2024-09-27T15:00:00

Join us for the first annual Deployables Day, a citywide training exercise on temporary flood protection

Boston is among the most vulnerable cities in the country to flooding. As sea levels rise, damaging floods will shift from a rare occurrence to a common reality.

September 27, 2024 | 10 a.m. – 3 p.m.

Experience deployable flood barriers at City Hall Plaza. 

Learn about the City’s flood protection measures, ways to stay safe during a flood, and whether a deployable is right for you at Faneuil Hall. 

Visit deployable flood barriers across the city.

Explore how the City is being protected from flooding and what you can do to stay safe.

September 27, 2024
2024-09-27T10:00:00 - 2024-09-27T15:00:00
Join the Walking Tour
/
Chief Climate Officer Brian Swett and Chris Osgood, Director of Climate Resilience, will be leading a Downtown walking tour of deployable flood barriers. This walking tour will begin at 12 pm outside of the Congress St entrance of City Hall

What is a deployable flood barrier?

A deployable is a flood barrier system that is put into place before or during a flood, and then taken down after the flood has passed. Deployable flood barriers can be more effective than traditional temporary barrier methods, such as sandbags, and can be quickly deployed with minimal setup time. 

What does a deployable look like?

A deployable flood barrier is constructed from textile-based materials and metal posts that reside in a small container and are manually deployed. The supporting wall can belong to surrounding buildings or short to close-off doorways. The design is scalable to accommodate a range of water heights and layouts

Frequently Asked Questions

FAQs

How do I apply for a permit to install a deployable flood barrier?

Retrofitting your building with a deployable flood barrier will require an ALT Permit with the Inspectional Services Department.

If your proposed flood barrier is not completely contained within your privately-owned land parcel, you will need to apply for a Specific Repairs license from the City’s Public Improvement Commission. This requires several steps:

  1. Reach out to the Office of Emergency Management at OEM@BOSTON.GOV for input on how to incorporate your proposed flood barrier into existing emergency planning efforts in your area.
  2. Engage a building engineer to create engineered plans for your proposed barrier based on an existing conditions report which establishes property lines, building edges and sidewalk composition.)
  3. Reach out to the  Public Improvement Commission at PIC@BOSTON.GOV to notify the Commission of your interest in applying for license
  4. With PIC’s approval, submit your request for a Public Hearing on your proposed project.

How do I know when to put up my deployable flood barrier?

  1. For liability reasons, the City does not provide specific guidance on when to deploy privately-owned barriers. You can reference the Coastal Flood Resilience Design Guidelines and  Zoning Viewer for new construction and building retrofits to understand more about flood risk at your specific building’s elevation. 
  2. Best practice is to maintain a regularly-updated standard operating procedure (SOP) for when and how to deploy your flood barrier. Some factors to consider when creating an SOP include how long it takes to install, accessibility of entrances and exits when the barrier is deployed, and systems of notification for the building’s occupants
FAQ- For Building Owners

My building has a deployable flood barrier, how can I make sure it’s in compliance with City requirements and regulations?

Once installed, deployable flood barriers must be registered with the Office of Emergency Management via the Deployable Flood Barrier Registration Form. Building owners are responsible for keeping their registration information up to date

My building does not have a deployable flood barrier, how can I learn more about whether one is needed?

If you're a private building owner in Boston looking to assess whether a deployable flood barrier is suitable for your property, the City’s Coastal Flood Resilience Design Guidelines can provide valuable insights. Here’s a step-by-step approach to using these guidelines effectively:

  1. Assess your flood risk: The Coastal Flood Resilience Overlay District (CFROD) includes areas of the City of Boston anticipated to be flooded with a 1% chance storm event in 2070 with 40-inches of sea level rise. You can determine whether or not your building is in the CFROD by consulting the Zoning Viewer.
  2. Evaluate Building Vulnerabilities: Identify the specific vulnerabilities of your building. This includes the potential entry points for floodwaters (such as doors, windows, and garage openings) and the critical areas that need protection.
  3. Review Recommended Protection Measures: The City’s guidelines outline various floodproofing strategies based on different flood scenarios and building floor elevations.
  4. Consult with Experts: Engage with an architect or building engineer who can help assess your building’s specific needs based on the guidelines. They can offer recommendations on the most effective deployable barrier systems and ensure that the chosen solution aligns with both the guidelines and your building’s requirements.
  5. Review Regulatory Compliance: Ensure that the deployable barriers you consider meet local regulations and standards for flood protection. (See: How do I apply for a permit to install a deployable flood barrier? below)
  6. Plan for Integration: If deployable barriers are suitable, plan how they will be integrated into your building's flood preparedness strategy. This includes training for staff or occupants on deployment procedures and ensuring that the barriers are readily accessible when needed.

What types of deployable flood barriers exist?

 

Deployable flood barriers come in various types, each designed for different scenarios and levels of flood risk. Here’s a rundown of some common types:

  1. Inflatable Barriers: These are quick to deploy and typically consist of large, inflatable tubes that can be rapidly filled with air or water to form a barrier. They are often used in temporary or emergency situations.
  2. Modular Barriers: These systems consist of interlocking units that can be assembled to create a barrier of the desired length and height. They can be made from materials like plastic, metal, or composite materials and are useful for both temporary and semi-permanent installations.
  3. Hydraulic Barriers: These barriers use water pressure to create a seal. They typically consist of a flexible membrane supported by water-filled bladders or other hydraulic mechanisms. They can be effective for longer-term solutions and can adapt to various flood depths.
  4. Barrier Walls: These are often made from materials like concrete, metal, or reinforced plastic and can be erected or dismantled as needed. They can be either permanent or deployable.
  5. Sandbags and Water-filled Barriers: Traditional sandbags are still commonly used, though they are labor-intensive to deploy. Water-filled barriers are similar but use water instead of sand, offering quicker setup and removal.
  6. Rolling Barriers: These are large, roll-up barriers that can be unrolled and placed across an area to form a flood barrier. They are typically made from durable materials like heavy-duty fabrics or polymers and are often used for large-scale protection.
  7. Fabric and Composite Barriers: These barriers use advanced fabrics or composite materials to create a deployable barrier. They are often lightweight and designed for quick deployment and storage.
  8. Gates and Shields: These barriers can be deployed across doorways, driveways, or other openings. They are often used in combination with other types of barriers for added protection.

How do I talk to my building owner or super about deployable flood barriers?

If you are a tenant in a flood-prone building and aren't sure if your building manager or owner knows about flood deployables, share this page with them! It features a FAQ for property managers and owners to help them assess if a deployable flood barrier is right for their property.

 

 

  •  

How can I stay safe during a flood?

  1. Check out the Office of Emergency Management’s Tips for Dealing with a Flood. 
  2. Sign up for emergency notifications through AlertBoston.
  3. Know your zone! Know your hurricane evacuation zone and route and be prepared to evacuate if directed by public officials.
  4. Find out how vulnerable your home is to flooding and, if your home is in a flood-prone area, contact the National Flood Insurance program to learn what mitigation measures you can take in advance.
  5. If you live in a flood-prone area, keep these materials on hand: sandbags, plywood, lumber, plastic sheeting, trash bags, shovels, work boots, and gloves.
  6. Put together a disaster supply kit, including a flashlight, batteries, first aid supplies, copies of critical information, and non-perishable food items.

 

Have Questions?
/
email us at environment@boston.gov
Last updated:

300 Warren Street Abutters Meeting

All alcohol license. Operating hours Monday - Sunday 11 a.m. - 2 a.m.

August 20, 2024
2024-08-20T18:00:27 - 2024-08-20T19:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 889 8571 4436

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s).

 

August 20, 2024
2024-08-20T18:00:27 - 2024-08-20T19:00:00
Last updated:

7-11A Ackley Place Abutters Meeting

Erect four new three-story townhouses with four interior parking spaces on a 5702.5 sf lot.

 

August 19, 2024
2024-08-19T19:00:26 - 2024-08-19T20:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 860 9035 7844

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s). 

 

August 19, 2024
2024-08-19T19:00:26 - 2024-08-19T20:00:00
Last updated:

4228 Washington Street Abutters Meeting

All alcohol license

August 19, 2024
2024-08-19T18:00:43 - 2024-08-19T19:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 811 5537 2331

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s)

 

August 19, 2024
2024-08-19T18:00:43 - 2024-08-19T19:00:00
Last updated:

403A Centre Street Abutters Meeting

"Don Tequeno y Dona Arepa" applicant for Beer and wine license. Hours of operation M-F 9 a.m.-11 p.m., Sat-Sun 8 a.m.-11 p.m.

 

August 15, 2024
2024-08-15T19:00:30 - 2024-08-15T20:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID:  880 1450 5810

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s). 

 

August 15, 2024
2024-08-15T19:00:30 - 2024-08-15T20:00:00
Last updated:

58 Cedrus Avenue Abutters Meeting

Change occupancy from single-family into a two-family residential. Extend living space into the basement from unit one. *one-family #3491/1928.

August 15, 2024
2024-08-15T18:00:14 - 2024-08-15T19:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 894 6287 5464

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s).

 

August 15, 2024
2024-08-15T18:00:14 - 2024-08-15T19:00:00
Last updated:

679 Cummins Highway Abutters Meeting

Subdivision of existing parcel and create w/ new parcel to have address of 679 Cummins Hwy. This application is for the Erection of a new three-family home with two off-street parking spaces and new curb cut, basement storage and utilities. three bedrooms, two bathrooms per unit. Common interior and exterior stairs. Solar-ready.

August 14, 2024
2024-08-14T18:00:15 - 2024-08-14T19:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 831 8399 3430

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s).

 

August 14, 2024
2024-08-14T18:00:15 - 2024-08-14T19:00:00
Last updated:

1435 River Street Abutters Meeting

Proposed to erect a new two-family on a vacant lot.

August 13, 2024
  • 7:00pm - 8:00pm
  • VIRTUAL
    VIA ZOOM,
  • Contact:
    Jeremie Bembury
  • Price:
    FREE
  • Neighborhood:
    Hyde Park
  • Event Type:
  • Posted:
2024-08-13T19:00:44 - 2024-08-13T20:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 880 2115 2147

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s)

August 13, 2024
  • 7:00pm - 8:00pm
  • VIRTUAL
    VIA ZOOM,
  • Contact:
    Jeremie Bembury
  • Price:
    FREE
  • Neighborhood:
    Hyde Park
  • Event Type:
  • Posted:
2024-08-13T19:00:44 - 2024-08-13T20:00:00
Last updated:

1501 Dorchester Avenue Abutters Meeting

Papa John's has applied to the Licensing Board for the issuance of a new Common Victualler License (no alcohol) with hours of operation as follows: Sunday - Thursday 10 a.m.-2 a.m.; Friday & Saturday 10 a.m.-3 a.m.

August 13, 2024
2024-08-13T18:00:23 - 2024-08-13T19:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 820 6487 8680

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s). 

 

August 13, 2024
2024-08-13T18:00:23 - 2024-08-13T19:00:00
Last updated:

471 W Broadway Abutters Meeting

New Common Victualler license with takeout, hours 7 a.m.- 11 p.m., proposed name “Playa Bowls”

August 12, 2024
2024-08-12T19:00:00 - 2024-08-12T20:00:00

The purpose of this meeting is to get community input and listen to the resident's positions on this proposal. This is a virtual meeting via Zoom

Meeting ID: 844 7973 2470

Please note, the City does not represent the occupant(s)/developer(s)/attorney(s)/applicant(s).

 

August 12, 2024
2024-08-12T19:00:00 - 2024-08-12T20:00:00
Subscribe to Civic Engagement
Back to top