city_hall

Official websites use .boston.gov

A .boston.gov website belongs to an official government organization in the City of Boston.

lock

Secure .gov websites use HTTPS

A lock or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

JFK Elementary Geothermal Project

Mayor Wu has announced a groundbreaking initiative to advance Boston’s municipal buildings toward carbon neutrality by 2050. The JFK Elementary School geothermal project exemplifies this vision, by upgrading municipal buildings with cutting-edge energy technology.

Key Benefits for the Community

  1. Carbon Neutrality Leadership:
    • This project is a flagship effort toward electrifying Boston’s municipal building stock and reducing reliance on fossil fuels.
    • It aligns with the City’s Climate Action Plan to mitigate climate change through sustainable infrastructure investments.
  2. Enhanced Learning Environment:
    • Students and teachers will benefit from improved indoor air quality, modernized ventilation systems, and comfortable temperature control.
    • Geothermal heating and cooling provide a quiet, efficient, and sustainable solution for temperature regulation year-round.
  3. Economic and Environmental Savings:
    • The project’s Energy Conservation Measures (ECMs) are designed to reduce utility costs while lowering the school’s carbon footprint.
    • Energy-efficient upgrades to enhance long-term operational savings.

Project Highlights

  • Geothermal Innovation:
    • A closed-loop geothermal heat pump system will replace traditional heating and cooling, marking JFK Elementary as a model for sustainable energy solutions in schools.
  • Comprehensive Energy Upgrades:
    • Replacement of gas water heaters with electric heat pump systems.
    • Advanced Building Management System (BMS) for efficient energy use.

Timeline

  • Summer 2024: Test well drilling, initial vertical drilling, and geotechnical analysis.
  • Summer 2025: Geothermal vertical well-drilling 
  • Summer 2026: Horizontal trenching, building controls upgrades, electrical upgrades, and indoor heat pump system integration.
  • If you have a question/ comment leave it here!
  • Join our outreach list for email updates
  • Environment Newsletter

Questions/Comments?
/
Send in your comments/questions using this form. We will get back to you shortly. Be sure to categorize your query using the drop down menu on the form. Thanks!

Past Bulletins (2026)

Past Bulletins

Past Bulletins will be posted on a weekly basis. 

Summer 2025 Construction

Daily Bulletins and Sensor Data for Summer 2025 construction work are available here

  • If you have a question/ comment leave it here!
  • Join our outreach list for email updates
  • Environment Newsletter

Back to top