- Executive Summary
- Draft Finding of No Significant Impact
- Draft Integrated Feasibility Report and Programmatic Environmental Assessment
- Appendix A: Agency Correspondence
- Appendix B: Coastal Engineering
- Appendix B, Attachment: Coastal Report
- Appendix C: Cultural Resources
- Appendix D: Environmental Resources
- Appendix E: Economics
- Appendix F: Geology
- Appendix G: Geotechnical Engineering
- Appendix G, Attachments: Geotechnical Drawings
- Appendix H: Structural Engineering
- Appendix H, Attachments: Structural Calculations
- Appendix I: Civil Engineering
- Appendix I, Attachments: Civil Drawings
- Appendix J: Interior Drainage
- Appendix J, Attachments: Stormwater Modeling
- Appendix K: Public Involvement [OMITTED IN DRAFT; TO BE INCLUDED IN FINAL REPORT]
- Appendix L: Hazardous, Toxic, and Radioactive Waste (HTRW) Considerations
- Appendix M: Cost Engineering
- Appendix M, Attachments: Cost Estimates
- Appendix N: Real Estate