CONCRETE AND RAILING REPAIRS FOR MONASTERY PATH (PWD)
The City of Boston Public Works Department (PWD) is seeking quotes to procure a contractor who can provide service to repair Monastery Path, specifically the concrete and railing system. The goal is to restore structural integrity and safety by removing and replacing a 55-foot section of the path, repairing the railing system, and stabilizing the surrounding embankment. The work includes demolition, regrading, concrete installation, rebar reinforcement, railing reinstallation, and site restoration. WRITTEN QUOTE CONTRACT (30/39M)
Proposals will be solicited through the City of Boston’s Supplier Portal: boston.gov/supplierportal. All times refer to Eastern Standard Time.
Contract Documents will be available through the Supplier Portal on or about: 9:00 am on March 24th, 2025
Quotes shall be submitted via the Supplier Portal before 12:00 pm, on April 7th, 2025.
- Posted 03/24/2025 - 9:00am
- Closes 04/07/2025 - 12:00pm
- Type Electronic
-
Awarded by
-
Project NumberEV00015708
-
UNSPSC72150000
-
Questions about this page? Contact:Stephen Powers
-
Related Links